Total War: Logistics, Secrecy, and Survival in Moor Row

While often overshadowed in broader historiography by the heavy industrial targets of the "Barrow Blitz," Moor Row functioned as the operational heart of a logistical network that underpinned the United Kingdom's munitions production and mineral extraction during the Second World War.

The village, originally established to serve the haematite iron ore mines in the 19th century, evolved into Western Cumberland's most vital railway junction and goods yard.

This research analyses the role of Moor Row as a critical feeder for the Royal Ordnance Factories (ROFs) at Drigg and Sellafield, its proximity to the massive Royal Naval Armament Depot (RNAD) at Broughton Moor, and the complex civil defence and security apparatus required to protect this "Spaghetti Junction of the North".

The Geological and Industrial Foundation of Strategic Infrastructure

To understand the wartime significance of Moor Row, it is essential to first evaluate the geological imperative that dictated the development of its infrastructure. The West Cumbrian iron ore field, extending from Lamplugh in the north to Calder Bridge in the south, contains high – grade haematite deposits restricted largely to the Carboniferous Limestone.

Moor Row was at the epicentre of this extraction. The Montreal Mines in the village produced approximately 250,000 tons of ore annually, a volume that necessitated a highly sophisticated transport solution. The Whitehaven, Cleator and Egremont Railway (WC&ER), established in 1854, designed Moor Row as a central hub where four major industrial lines converged. This Victorian infrastructure, characterised by dense shunting yards and heavy – duty locomotives, provided the British War Office with a ready – made logistical skeleton to support the rapid industrialisation required for total war.

Evolution of the Moor Row Railway Junction

By the late 19th century, the junction at Moor Row had become Western Cumberland's most important goods yard. The station was not merely a passenger stop but a high – capacity sorting facility for the movement of stone, coal, and haematite. The architectural development of the station, specifically the 1902 additions, reflected a massive scale of operations with two main platforms, extensive sidings, an engine shed, and locomotive and wagon works.

Railway Operational Milestones Date Strategic Context
Opening of WC&ER Junction July 1, 1857 Establishment of primary mineral transit hub
Extension to Sellafield August 1, 1869 Connection to Furness Railway for southward transit
Reconstruction of 1902 1902 Expansion to zenith capacity for shunting and sorting
Withdrawal of Public Services January 7, 1935 Shift to predominantly mineral and industrial focus
Reinstatement for WWII March 11, 1940 Emergency revival for ROF construction and staffing

The physical infrastructure was constantly challenged by the very industry it served. The intensive extraction of haematite caused pervasive mining subsidence, necessitating the downgrading of original lines and the construction of deviation lines, such as the 1866 route beyond the engine shed. This instability required a specialised workforce of railway engineers, many of whom resided in local houses, like Victoria Villa, to maintain the operational integrity of the junction during the high – pressure years of the war.

Moor Row as a Logistics Feeder for the Royal Ordnance Factories

As the conflict intensified, West Cumbria's remote coastal geography became its primary strategic asset. The hazardous nature of trinitrotoluene (TNT) manufacturing led the government to site ROF Drigg and ROF Sellafield in isolated areas along the coastal railway line. Moor Row, positioned at the convergence of lines leading to Whitehaven, Sellafield, and the inland ore fields, became the primary logistical "feeder" for these sites. These sites were generally outside the range of German bombers. 

Reinstatement of Workmen's Services

The outbreak of war necessitated a radical reversal of the 1930s trend toward railway decline. Although public passenger services through Moor Row had been withdrawn in 1935, the spring of 1940 saw an emergency reinstatement of workmen's trains. These services were officially brought back on March 11, 1940, to support the thousands of labourers required to build and then operate ROF Drigg. For a brief but intense period, the 1902 station buildings were utilised to their maximum capacity as workers from Whitehaven, Egremont, and the surrounding hamlets were funnelled through Moor Row toward the coastal munitions plants.

The Dual – Flow Logistical System

The operational complexity of Moor Row during the war was defined by a "dual – flow" system. While the junction managed the transit of workmen, it also had to sort and dispatch massive freight tonnage. Freight traffic was characterised by two primary flows:

  • Mineral Exports: Iron ore from the deep – shaft Beckermet Mine and limestone from Rowrah Quarry moved through Moor Row toward the national steelworks and the West Coast ports.
  • Munitions Transit: Raw chemical components and finished explosives from the ROFs were sorted in the Moor Row yards before being dispatched toward major military hubs or naval ports.

This synergy between the mining industry and the munitions sector created a high – density "Spaghetti Junction" environment. The shunting yards at Moor Row became Western Cumberland's most critical bottleneck; a failure here would halt not only the production of steel but also the supply of TNT to the front lines.

RNAD Broughton Moor: "The Dump" and the Architecture of Secrecy

The strategic landscape of Moor Row was inextricably linked to its proximity to RNAD Broughton Moor, located approximately 10 miles to the north. Known locally as "The Dump," this facility was built between 1938 and 1939 on the former site of the Buckhill Colliery. Covering 1,050 acres, it served as a primary storage, inspection, and proofing facility for the Royal Navy.

Logistical Connectivity and Internal Rail Networks

While RNAD Broughton Moor had a dedicated branch line to Siddick Junction, its operations depended on the wider West Cumbrian railway network that converged at Moor Row. The depot utilised a complex arrangement of both standard and narrow – gauge (2 ft 6 in) railways to move munitions within its 10.46 – kilometre perimeter fence. The internal logistics were designed to minimise risk, utilising 132 timber – framed magazines and 37 brick – built magazines, along with 128 pre – cast concrete "Stanton shelters" for increased storage capacity.

RNAD Broughton Moor Infrastructure Quantity Design Purpose
Timber-framed Magazines 132 Dispersed storage to prevent chain reactions
Brick-built Magazines 37 High-capacity, reinforced storage
Stanton Shelters 128 Pre-cast concrete bunkers for small arms/explosives
Narrow Gauge Track 25 miles Internal transport within the magazine complex
Standard Gauge Track 3 miles Connection to the national rail system via Siddick

The depot's reach extended through a series of sub – depots, including an underground facility at Camerton and above – ground stores at Kelbarrow and Knockmurton Fell. The entire complex was a physical manifestation of wartime secrecy, utilising the old colliery spoil heaps and the bleak moorland terrain to camouflage a facility that at its peak comprised over one thousand structures.

The Culture of the Official Secrets Act

The proximity to "The Dump" imposed a culture of silence on the inhabitants of Moor Row and the surrounding villages. Workers at the munitions facilities were bound by the Official Secrets Act, often unable to disclose the nature of their work even to their own families. This secrecy was not merely administrative but was a daily operational reality. The transport of munitions through the Moor Row junction was conducted with minimal publicity, often using unadvertised trains and "silent" shunting procedures during the blackout.

The 1944 Explosion: Catastrophe and Concealment

The inherent danger of the West Cumbrian munitions network was tragically realised on January 18, 1944, when a massive explosion occurred at RNAD Broughton Moor. Although the blast was centred at the depot, its effects and the subsequent management of the incident provide vital insights into the home front experience in nearby Moor Row.

The explosion originated in General Purpose Laboratory Room Number 3, where a sensitive fuse in a naval mortar bomb is believed to have detonated 72 lbs of high explosive. This initial blast triggered a secondary detonation of 1,296 pounds of high explosive in a railway truck parked outside. The resulting tremor was felt 15 miles away, vibrating through the foundations of the houses in Moor Row.

Casualties and Local Impact

The explosion killed 11 local workers and injured 70 others. The victims represented a cross – section of the Cumbrian workforce, including many women who had been drafted into munitions work.

Victim Name Location/Role
Mrs. Mary Barnes Civilian Laboratory Worker
Mrs. Gertrude Fee Civilian Laboratory Worker
Miss Jean Lister Civilian Laboratory Worker
Mr. Edward Lynch Civilian Laboratory Worker
Mr. William Morrison Civilian Laboratory Worker
Mrs. Elizabeth Moses Civilian Laboratory Worker (Mother of fallen soldier)

The tragedy was subject to intense press censorship. The Cumberland Evening Star could only report the event as having occurred "in a North Western works," and the names of the dead were not publicly commemorated until after the Official Secrets Act time restrictions had expired. This enforced anonymity added a layer of psychological strain to the village of Moor Row, as residents were forced to process a collective trauma without public acknowledgement.

Air Raid Precautions (ARP) in a Vital Railway Hub

Moor Row's importance to the railway network and the iron ore industry made it a potential target for the German Luftwaffe. Consequently, the village developed a robust civil defence infrastructure under the direction of the Ministry of Home Security.

The Blackout and Warden Operations

From September 1, 1939, the "Blackout" was strictly enforced in Moor Row. For a railway junction that relied on visual signals and night – time shunting, this presented immense operational challenges. Railway workers used shielded lamps, and the shunting yards were equipped with specialised ground level lighting to maintain throughput while minimising visibility from the air.

The ARP personnel in Moor Row were recruited from among the older miners and railwaymen who were exempt from frontline service. These wardens were responsible for:

  • Enforcing blackout curtains and light – locks in the terraced rows like Penzance Street.
  • Manning warden posts equipped with bells and rattles to warn of gas attacks.
  • Coordinating the distribution of gas masks, which became a ubiquitous symbol of daily life for the village's children and workers.

Air Raid Shelters and Mining Hazards

The provision of air raid shelters in Moor Row followed national patterns but was influenced by the village's industrial topography. Anderson shelters, constructed from corrugated iron and covered with earth, were distributed to low income families with gardens. However, the older 1859 terraced houses on Dalzell Street often lacked the space for such structures.

A unique consideration for Moor Row was the interaction between air raids and the unstable ground. The village sat atop 31 identified mine pits. There was constant concern that a direct hit or the vibration from heavy bombing could trigger a catastrophic subsidence event in the Montreal or Montreal – area mines. While the deep mine shafts offered theoretical protection as deep – level shelters – similar to the London Underground – the risk of flood or collapse generally precluded their official use for civil defence.

The Luftwaffe Threat: Target Mapping and Intelligence

Whether the Moor Row railway junction was specifically targeted by the Luftwaffe remains a subject of intense historical scrutiny. German intelligence was undoubtedly aware of the strategic importance of the West Cumbrian iron ore fields and the coastal railway.

German Target Folders for West Cumbria

The Luftwaffe maintained extensive target folders (Luftwaffe Target Folders) for British industrial and transport infrastructure. Evidence of their interest in the region includes:

  • Whitehaven Targets: Specific target folders existed for Whitehaven and its harbour facilities, which served as the primary export point for the haematite sorted at Moor Row.
  • Barrow-in-Furness: The Vickers shipyard in Barrow was a primary target, suffering heavily during the 1941 Blitz. The proximity of Moor Row to the main line feeding Barrow meant that any disruption at the junction would have significantly hampered the movement of steel plating to the shipyards.
  • Strategic Rail Maps: German military railway maps from the period identified major marshalling yards and tonnage capacities. Moor Row, as the hub of four lines, would have been identified as a critical "transport bottleneck".

The Use of Decoy Sites

Despite its vulnerability, Moor Row and its junction largely escaped direct hits. This can be attributed in part to the "Starfish" decoy sites and incendiary decoys located at Drigg and Whicham. These installations were designed to draw the Luftwaffe away from high – value industrial targets like the ROFs and the railway hubs by simulating the light signatures of a burning town or factory. The effectiveness of these decoys, combined with the difficult navigation over the Lakeland fells, likely spared Moor Row from the scale of destruction seen in more accessible urban centres.

The Home Guard: Protecting the Vulnerable Points

The defence of the Moor Row infrastructure fell to the Home Guard, specifically the 5th Cumberland Battalion (Border Regiment). Formed originally as the Local Defence Volunteers (LDV) in May 1940, the Home Guard in West Cumbria was comprised of men in reserved occupations – miners, railwaymen, and steelworkers.

Guarding the "Spaghetti Junction"

The Home Guard's primary responsibility in Moor Row was the protection of "Vulnerable Points" (VPs). These included:

  • Railway Bridges and Viaducts: The WC&ER network featured numerous bridges over local becks, such as the line toward Mirehouse Junction, which were essential for heavy mineral traffic.
  • Signal Boxes and Shunting Yards: The 1902 signal boxes at Moor Row were manned by Home Guard sentries to prevent sabotage or to report on enemy paratrooper activity.
  • Munitions Stores: The Home Guard provided secondary security for the explosives transit sheds and the locomotive works that kept the munitions trains running.

The volunteers were trained in guerrilla tactics and the use of specialised weaponry like the Northover Projector and the Blacker Bombard – anti – tank weapons that were stationed at strategic junctions leading from the coast. Despite their popular depiction as "Dad's Army," the Home Guard in a high priority industrial zone like Moor Row was a well equipped and serious force, often conducting night patrols over the rugged, mine scarred terrain.

The Women's Land Army and Social Transformation

The war fundamentally altered the social and labour dynamics of Moor Row. With a significant portion of the male workforce either in the mines or the forces, women took on unprecedented roles in the village and the surrounding countryside.

The Land Girls of West Cumbria

The Women's Land Army (WLA) and the Women's Timber Corps (the "Lumber Jills") were active on the farms and in the forests around Moor Row. Many of these women were recruited from urban centres like Newcastle and housed in local hostels or private billets.

WLA Operational Dynamics Details
Typical Working Week 48 hours (Winter) / 50 hours (Summer)
Common Tasks Rat catching, milking, land reclamation, forestry
Accommodation Hostels (e.g., Stockton House) or farmhouse billets
Pay and Conditions 28s per week (minus 14s for board)

In the Moor Row area, Land Girls were instrumental in the "Dig for Victory" campaign, turning marginal moorland into productive allotments to feed the mining and railway workforce. They also undertook specialised horticultural tasks, such as growing camomile for use as airfield camouflage. The presence of these women in the village – often seen riding bicycles to local farms at 6:00 AM – marked a permanent shift in the traditional Cornish mining culture that had previously dominated Moor Row.

Labour Shifts in the Mines and Railways

Beyond the Land Army, women were increasingly employed within the ROFs and the railway's administrative offices. The 1944 explosion at Broughton Moor highlighted the extent to which women were involved in the high – risk laboratory work of "The Dump". Within the village school, children were also mobilised, with the log books recording the use of allotments as "school gardens" for the production of potatoes and vegetables during the 1917 and 1940 – 45 shortages.

From Munitions to Atoms: The Post – War Legacy

The infrastructure established or revived in Moor Row during the Second World War did not disappear with the cessation of hostilities. Instead, it provided the foundation for the region's transition into the "Nuclear Era."

The Strategic Pivot to Windscale

In the post – war years, the ROF Sellafield site was chosen as the location for the United Kingdom's nuclear program, becoming Windscale (and later Sellafield Ltd). The logistical feeder system that had served the munitions industry was seamlessly repurposed:

  • Workmen's Trains: The service that had carried munitions workers from Moor Row to Drigg was extended to serve the nuclear workforce at Windscale starting in 1949.
  • Logistics Connectivity: The WC&ER lines continued to move heavy materials and specialised chemicals for the nuclear sector, ensuring that Moor Row station remained functionally relevant until 1965.

The unadvertised workmen's shuttles – became the "Nuclear Trains," a secret history that began with the emergency reinstatements of 1940.

The station at Moor Row eventually closed to passengers in 1965, but the freight lines remained operational until the closure of the Beckermet Mine in 1980, marking the final end of the 120 – year industrial era that had seen the village survive the greatest conflict in human history.

The Endurance of the Cumbrian "Spaghetti Junction"

The Second World War transformed Moor Row from a declining Victorian mining village into a critical nodal point of the British Home Front. Its railway junction served as the logistical lifeblood for the production of haematite and the movement of munitions, feeding the ROFs and connecting with the massive reserves at RNAD Broughton Moor. The village’s experience was characterised by a unique blend of high intensity industrial activity and profound state mandated secrecy.

Through the efforts of the Home Guard, the ARP wardens, and the Women's Land Army, Moor Row maintained its operational integrity despite the threats of Luftwaffe targeting and the inherent instability of the ground beneath it. The 1944 explosion at "The Dump" stands as a somber reminder of the human cost of this strategic importance.

Ultimately, the infrastructure and logistical protocols developed in Moor Row during 1939 – 1945 paved the way for the region’s subsequent identity as the centre of the UK’s nuclear industry, ensuring that the legacy of the "Red Gold" village would endure long into the 21st century.

Land Girls Illustration
Land Girls Illustration

Comments

ARCHIVE HIGHLIGHTS

About Moor Row

The 100-Fathom Descent: Dual Extraction at Moor Row’s Premier Pit

The Genesis of Industry: Summerhill Mansion and the Dalzell Legacy in Moor Row

Deep History: 6000 Years Of Moor Row

​The Final Departure: Documenting the Demolition of Moor Row Railway